Industrial & Manufacturing
case studies
Commercial Companies
PROJECT REFERENCE
Mining Company
Problem to be solved:
Client: Mining Company
Project value: NAD 2 783 768 .77
Year of execution: 2022
Plant description: 26 m3/h containerised dam water treatment plant
BWT installed a reverse osmosis system complete with filtration pre-treatment, including chemical dosing and post remineralisation
The client was able to deliver safe drinking water to the mine community.
PROJECT REFERENCE
Plastic packaging Manufacturer
Problem to be solved:
Client: Manufacturer of plastic packaging
Project value: NAD 416 927.35
Year of execution: 2022
Plant description: 0.5 m3/hr RO system with dosing station
We installed a skid mounted reverse osmosis unit with GAC pretreatment and chemical dosing to control scale, corrosion and biofilm production.
The client was able to enjoy less downtime due to breakdowns and a lower maintenance cost across the system.
PROJECT REFERENCE
Mining Company
Problem to be solved:
The only water source in the area was borehole water, which was contaminated with iron. This posed an operation risk to infrastructure as the water was being used for both potable and process purposes.
Client: Mining Company
Project value: NAD 1 410 151.50
Year of execution: 2022
Plant description: 4 m3/h containerised borehole water treatment plant
BWT installed an iron removal system to ensure safe water for downstream applications.
The client was able to operate their processing facility to the required level and also produce potable water.
PROJECT REFERENCE
Mining Company
Problem to be solved:
Client: Mining Company
Project value: NAD 1 410 151.50
Year of execution: 2022
Plant description: 6 m3/h containerised borehole water treatment plant
BWT installed a reverse osmosis system complete with filtration pre-treatment, including chemical dosing and post remineralisation
Benefit to the Client: The client was able to deliver safe drinking water to the mine community.
PROJECT REFERENCE
Cooling tower side stream
Problem to be solved:
Client: Vanadium processing facility
Project value: NAD 194 292.82
Year of execution: 2022
Plant description: Cooling tower side stream filter
Side stream filters are installed to eliminate any build up of suspended material. We supplied AFM filtration with auto backwashing heads.
The client can seamlessly operate their cooling towers by preventing solids build-up in the cooling tower sump and preventing heat transfer in cooling tower.
PROJECT REFERENCE
Water retailer
Problem to be solved:
Client: Retailer of borehole water
Project value: NAD 237 624.03
Year of execution: 2021
Plant description: 1 500 L/h borehole water treatment solution
We supplied a AFM filter, softener and reverse osmosis system. The softener was required to bring the hardness to within the limit for the RO, while the RO addressed the high salinity. The system included bypass remineralisation and disinfection.
The client was able to reliably supply and sell safe drinking water to communities without water.
PROJECT REFERENCE
Bakery Boiler
Problem to be solved:
The industrial bakery makes use of a boiler for processing purposes. The feed water to the boiler is hard, which will cause scaling, and ultimately production losses.
Client: Bakery
Project value: NAD 119 717.52
Year of execution: 2022
Plant description: Skid mounted Duplex softener to deliver 10 000L/hr (including feed pump on level control)
We offered a skid mounted duplex softener to ensure uninterrupted soft water supply to the boiler.
The client was able to carry out all necessary activities in the production of baked goods without the risk of critical equipment failure and downtime.