PROJECT REFERENCE
Spar
Problem to be solved:
Client: Spar Shopping Centre
Capital Cost: NAD 1 100 000 ExVAT
Operating Cost: NAD 10 per kL (Excluding power consumption)
Plant Capacity: 150 000 L per day
Customer was paying over R 30 000 per week for tankers to supply water when municipal water supply failed.
Borehole treatment system was designed and built within 4 weeks
Constant and reliable water supply
Reduced water cost
Consistent and reliable water quality
PROJECT REFERENCE
Mall
Problem to be solved:
Client: Eastgate Mall
Capital Cost: NAD 1 350 000 ExVAT
Operating Cost: NAD 8 per kL (Excluding power consumption)
Plant Capacity: 120 000 L per day
Frequent down time of municipal water supply resulting in no water to the mall.
Surface and rain water treatment system provides water supply from alternative water sources.
Constant and reliable water supply for the mall
Reduced water cost
Consistent and reliable water quality
PROJECT REFERENCE
Shopping Centre
Problem to be solved:
Municipal water interruptions causing major strain on businesses as most shops rely on water for the operations. BWT supplied and installed a borehole water treatment system that removes all contaminants and delivers water that complies with drinking water specifications.
Client: Cornerstone Shopping Centre
Capital Cost: NAD 330 000 ExVAT
Operating Cost: NAD 10 per kL (Excluding power consumption)
Plant Capacity: 80 000 L per day
Water Source: Borehole
Municipal water interruptions causing major strain on businesses as most shops rely on water for the operations. BWT supplied and installed a borehole water treatment system that removes all contaminants and delivers water that complies with drinking water specifications.
The system ensures that there is sufficient water at every tap 24/7 throughout the shopping centre.